CIS 510 Assignment 1 – Error Handling in an Activity Diagram

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.

Refer to the activity diagram Figure 2-15 on page 59 of the textbook. The diagram omits several error-handling pathways.
Write a two to three (2-3) page paper in which you:

  1. Using Microsoft Visio or an open source alternative such as Dia, update the diagram to include two (2) error-handling pathways. Note: The graphically depicted solution is not included within the required page length.

In the manufacture of armatures for electric motors, inspection results pf 20 sample of each having.

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.

Question

In the manufacture of armatures for electric motors, inspection results pf 20 sample
of each having 100 units of armatures in given in the following table.
Calculate the average fraction defective and control limit. Construct a “p-chart”
and comment about the process.

The current erection cost of a structure is Rs. 13,200. If the labour wages per day increase by 1/5.

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.
Question

The current erection cost of a structure is Rs. 13,200. If the labour wages per day increase by 1/5 of the current wages and the working hours decrease by 1/24 of the current period, then the new cost of erection in Rs. is (A) 16,500 (B) 15,180 (C) 11,000 (D) 10,120

 

In a glass factory , they go in for measuring the thickness of the class by taking 5 samples from…

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.

Question

In a glass factory , they go in for measuring the thickness of the class by
taking 5 samples from lot of 100 and 6 lots are checked on machine-3.
Here , the quality characteristics measured is “Thickness”. Consider for the
following samples shown in a table.
Draw the mean and range charts and plots the values. State whether the
process is under statistical control or not. Comment about process.

3. There are two objects- $product1 = new Shop(); $product2 = new Shop(); Which one of the following

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.
Question

3. There are two objects-
$product1 = new Shop();
$product2 = new Shop();
Which one of the following statements is right about them?
a) $product1 and $product2 are same objects of the same type generated from a single class.
b) $product1 and $product2 are different objects of the same type generated from a single class.
c) $product1 and $product2 are same objects of the different type generated from a single class.
d) $product1 and $product2 are different objects of the different type generated from a single class.

 

A bar is subjected to fluctuating tensile load from 20 kN to 100 kN. The material has yield strength

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.

Question

A bar is subjected to fluctuating tensile load from 20 kN to 100 kN. The material has yield strength of 240 MPa and endurance limit in reversed bending is 160 MPa. According to the Soderberg principle, the area of cross-section in mm 2 of the bar for a factor of safety of 2 is (A) 400 (B) 600 (C) 750 (D) 1000

During the electrochemical machining (ECM) of iron (atomic weight = 56, valency = 2) at current of..

Click here to order this assignment @Essaywriting.us.No Plagiarism.Written from scratch by professional writers.
Question

During the electrochemical machining (ECM) of iron (atomic weight = 56, valency = 2) at current of 1000 A with 90% current efficiency, the material removal rate was observed to be 0.26 gm/s. If Titanium (atomic weight = 48, valency = 3) is machined by the ECM process at the current of 2000 A with 90% current efficiency, the expected material removal rate in gm/s will be (A) 0.11 (B) 0.23 (C) 0.30 (D) 0.52